It Ain’t Over Til It’s Over

And so the saga of the bathroom remodel continues…

So after 6 weeks,  you’d think it would be finished, right? Oh no…it’s never quite that easy. 3 of the 4 walls had gotten done, except I still had to touch them up because I reused an old roller, which I am vowing to never do again. It’s not worth it, unless someone can tell me they’ve found a roller that really truly doesn’t shed after it’s been washed. But one thing I can’t abide is the residual gunk that sticks to the walls from the rollers, and now you’re left with the ‘gift’ of texture you didn’t plan on. So going back to get rid of it, means that when you lightly (and I truly do mean lightly) sand it off, you mar your semi-gloss finish. Yep, a spot for a little touch up. Many of them.

Or perhaps there was that spot on the side of the shower where I peeled off the painters tape and waited a smidge too long…and some paint came up with it. Got to sand and spackle THAT spot over, then touch that up too.  (At least I used painter’s tape!)

The last wall to be painted was the one behind the sink. It took forever to chisel out the old caulk on that last bit of wall space. The sink is set into an alcove, so it was caulked in on 3 sides, and the back wall was like concrete. I had to rotate between using a razor blade and a paint scraper to get it out. We were also a little challenged in coordinating schedules with the electrician to get the wiring done so that the sconces could be mounted.

Then of course there was the “paint the ceiling” adventure. Did you know that when ceilings have only the popcorn texture, unless they are painted, they can be a mess? Yep, get them wet and the popcorn falls right off. So when you actually paint them for the first time, the first coat of paint becomes like glue but initially ACTS like water. Let me explain.

Most people don’t own paint sprayers, nor do they hire someone to spray paint their ceilings (although if they were smart, they would do one of those two things.) They roller paint them. If your ceiling has never been painted, the first time it’s done you need to be very careful, as the paint will merely moisten the texture, and if you roller back and forth like you do on a wall, popcorn will just fall right off the ceiling…on your face…your shoulders…the floor…you get the idea. It’s a mess. (Handy tip #1: Use Glidden’s pink ceiling paint. It dries white but it makes it SO easy to see where you paint. The stuff is AMAZING.)  I did know that I needed to be careful but I expect because I was doing a bathroom ceiling, perhaps the popcorn was maybe a little extra touchy in a humid room I ended up with several places where it came down in spite of my cautiousness. Off we went to find a tube of popcorn touch up. (Handy tip #2: Get the stuff in the tube for a small area, not the spray can. Way easier to use, according to hubby who has done both.) That added a couple of days to the whole adventure, by the time he patched it up, we let it dry for 24 hours, and I was able to get the spots touched up.

Then got the electrician in to do the wiring and add the mounting boxes. No problems there. We got all the rest of the work done, painting completed, mounted the medicine cabinet so truly all that was left was to put in the lights. It was a Sunday evening, around 7 PM and I’m thinking “why not, let’s do this. We’ve installed light fixtures before. White to white, black to black, ground to ground”. Meanwhile Karma was laughing herself silly at me, it’s just too bad I couldn’t hear her.

We got the first light fixture out, wired it up and prepared to mount it, only to discover that it could’t be mounted to the box because the box was oriented straight up and down, and in the “12” and “6” positions are 2 solid plastic pieces that were exactly where the backs of my mounting screws needed to be. Without getting into detail, I’ll just say I have a clever husband who was able to solve it, but we sacrificed a bit of sheet rock in the process…on BOTH sides of the medicine cabinet. So…3 more days for patching and sanding sheet rock to make it sufficiently smooth, then tape off the cabinet, paint, wait for that to dry and then mount the new lights.

You’re thinking I was done, aren’t you?

Nope. In an effort to be eco-conscious, we ordered LED bulbs. I wanted to make sure they were bright enough as this would be where I put on makeup, and I’ve not used LED bulbs before so we went with fairly high lumens of output. They were bright alright so we said “hey, let’s get a dimmer switch for it!” So we headed off to the store, picked up a dimmer and installed that. Tested the dimmer by starting to dim the lights and they went from on to instant off. Huh? Looked at the lights I’d bought….I bought non-dimmable LED’s. Sigh. Back to the store. Got the dimmable LED’s this time, and they work beautifully. All that remained was adding a small cabinet for towels and a few decorative items on the walls, and some new valances. Doesn’t sound too bad, right?

And…3 months later, I can’t find the cabinet I want for the towels, let alone the towels I wanted in the right color. I’ve searched every combination of key words online for the cabinet, and everything looks too cheap, is too big, or to expensive. You know how it is when you have a particular look that you want? You don’t want to settle for “good enough” or “make do”. So we’re at the point of probably having hubby make me a cabinet in the spring. The towels are an entirely other story. Since I couldn’t find the color I wanted, I decided to dye them the color I wanted. Surprisingly, they are almost exactly the right color, although they didn’t dye as evenly as I would have liked. Fortunately I plan to use them as decorative, folded up accent towels to add color more than anything, and since this is our master bath, hubby and I are probably the only ones that will ever see them. Note to self: Use the washing machine, remember that the thread on the towels doesn’t dye.

Only 2 bathrooms, a bedroom, 2 hallways, and great room with 12 foot ceilings left to go.

Advertisement

One thought on “It Ain’t Over Til It’s Over

  1. Hehehe! Rather you than me, Beth! My DIY skills are… erm… well, you mentioned ceilings… when I paint them, most of the paint ends up on ME!!! All down my arm, neck, face, and so on. Only a lick on the ceiling. I tell myself it’ll do! 😎
    I’m whizzing through Blogland this evening, so I’ve quickly prepared the next part to save time (it’s actually taking longer, but hey ho!)
    My visiting, replying, commenting and the like have fallen a little by the wayside of late, for which I apologise, but wanted to call by today and wish you a Merry Christmas and a Happy New Year!

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.